VIEW OUR PREVIOUS WORK

Due to our wide-range of experience in this industry, we have worked on a variety of projects over the years. View a sample of these projects below:

Oswestry Greenway Footpath

A new sealed-surface cycle and pedestrian track was required in the railway corridor in Oswestry. This was located between Coney Green Way and Shrewsbury Road. Our team worked hard to construct this new path next to a retained railway track, which is currently undergoing restoration by Cambrian Heritage Railways. The project included the following:

  • The Clearance of Existing Brash.
  • The Excavation of Ground and the Formation ofLevel Ground.
  • The Construction of Four Hibernacula.
  • The Supply and Installation of a Cell-Web Tree Root Protection System.
  • The Construction of New Sealed Surface Footway.

Eaton Bridge Strengthening Works

A single carriageway bridge across the River Onny needed strengthening, and our team were on-hand to assist. This project included the following:

  • The Closure of the Road and the Provision of a Signed Vehicle Diversion Route.
  • The Installation of a Temporary Diversion Downstream for Pedestrians, Cyclists, and Horse Riders.
  • Bank Protection Works Were Installed Upstream, Including Driving Live Willow Stakes into the River Bed, Rock Replacement, Woven Willow Wall Construction, and Backfilling.
  • The Demolition of Bridge Deck and the Construction of New Reinforced Concrete Capping Beams, Reinforced Concrete Bridge Deck, and Parapet Beams. 
  • The Construction of New Masonry Parapets.

Newton Bends Safety Fence

Our team were tasked with replacing a 90-metre section of damaged safety fence at Newton Bends, near Ellesmere. The work that we took part in included the following:

  • The Closure of the Road and the Provision of a Signed Vehicle Diversion Route.
  • The Installation of a Temporary Diversion Downstream for Pedestrians, Cyclists, and Horse Riders.
  • Bank Protection Works Were Installed Upstream, Including Driving Live Willow Stakes into the River Bed, Rock Replacement, Woven Willow Wall Construction, and Backfilling.
  • The Demolition of Bridge Deck and the Construction of New Reinforced Concrete Capping Beams, Reinforced Concrete Bridge Deck, and Parapet Beams. 
  • The Construction of New Masonry Parapets.

This road forms part of the British Triathlon Championship route, and special measures were put in place during the road closure so that the event could proceed.